Board of Education Considers Proposed Capital Project
Every 5 years each school district in NYS is required to conduct an overall scope of necessary repairs needed to its buildings. The latest survey at VC was conducted in 2022 and found $172.5 Million in needed repairs. It would be too overwhelming to attempt to conduct all the needed repairs all at once. … Continue reading Board of Education Considers Proposed Capital Project
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed